ug5-1011

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
ug5-1011 [2019/07/30 09:53] – Questionnaires Michael Scottug5-1011 [2019/09/11 10:33] (current) – [Performance Charts] Michael Scott
Line 9: Line 9:
 You can also change the table's Date if there is more than one available (e.g. Vacancy Start Date and Entry Date). You can also change the table's Date if there is more than one available (e.g. Vacancy Start Date and Entry Date).
  
-At the bottom you can change the chart's date range and rounding system. E.g you will typically want to group shifts by week or month for the data to be meaningful.+At the bottom, in the **Date Selection** section, you can change the chart's date range and rounding system. E.g you will typically want to group shifts by week or month for the data to be meaningful. You can also select **Previous Year Comparison** to add a line (or lines) for the same period the previous year.
  
 You can use the **Split** option to split a statistic into multiple lines e.g by Temp Desk or Division. You can use the **Split** option to split a statistic into multiple lines e.g by Temp Desk or Division.
Line 16: Line 16:
  
 When you Execute the chart, you can change the **Chart Height** from the default Auto option. You need to experiment with what works best for your data. When you Execute the chart, you can change the **Chart Height** from the default Auto option. You need to experiment with what works best for your data.
 +
 +After you Execute a chart in the designer you can press the button to save it. You will be prompted to enter or edit the title.
  
 ==== Analysis Charts ==== ==== Analysis Charts ====
Line 31: Line 33:
  
 ==== Questionnaires ==== ==== Questionnaires ====
-Questions can be used for analysis and splits (single select questions), statistics (numeric questions), timings (date questions) and filters (all kinds of questions). The questions available are specified in two ways. If you have IQXWeb you can set up a Questionnaire Group with ID 'ANALYTICS' and questions attached to this group will appear in the chart designer. If no such group exists then questions designated 'Web View' will appear.+Questions can be used for analysis (single select questions), statistics (numeric questions), timings (date questions) and filters. The questions available are specified in two ways. If you have IQXWeb you can set up a Questionnaire Group with ID 'ANALYTICS' and questions attached to this group will appear in the chart designer. If no such group exists then questions designated 'Web View' will appear.
  
 ==== Drilldowns ==== ==== Drilldowns ====
Line 45: Line 47:
 If you want other consultants to have access to your charts, tick the **Shared** checkbox. You can specify an **Access Level** which ties in with the consultant's **Report View Level**. They will see your chart on their list and be able to view it and add it to their dashboard. When they view it, it will obey their Division rights, not yours. If you want other consultants to have access to your charts, tick the **Shared** checkbox. You can specify an **Access Level** which ties in with the consultant's **Report View Level**. They will see your chart on their list and be able to view it and add it to their dashboard. When they view it, it will obey their Division rights, not yours.
  
-The **Dashboard** and **Home Page** are two groupings of charts which can be shown in a single window by clicking the relevant button. In IQXWeb the Home Page charts are displayed in special cut down form but in IQX they are like an alternative Dashboard.+The **Dashboard** and **Home Page** are two groupings of charts which can be shown in a single window by clicking the relevant button. In IQXWeb the Home Page charts are displayed in special cut down form but in IQX they are like an alternative Dashboard.  
 + 
 +On each you can specify a 1 or 2 digit number denoting the row and column. E.g. if you want your dashboard to display 2 charts on the first row and 1 on the second you would set the values to 11, 12, and 2 (or 21). The number of charts across is limited by the width of the form on screen, up to a maximum of 4. The layout will be adjusted automatically as you resize the form, so if you specify 11, 12, 13, 14, 15, 16, 17, 18, 19 it will automatically pack them across then down according to form size.
  
  
  • ug5-1011.1564480401.txt.gz
  • Last modified: 2019/07/30 09:53
  • by Michael Scott