Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
sa_maintenance_2 [2020/07/14 14:49] – Viola Scott | sa_maintenance_2 [2022/12/12 10:56] (current) – [Shift Cancel Reasons] Shelley Hunter | ||
---|---|---|---|
Line 8: | Line 8: | ||
If the Week 1 ends on a Sunday the days will be presented in the Temp Desks as Monday to Sunday. To present the days in a different order make the Week 1 end on what is your last day of a week. (Not available with Safe Back Office)\\ | If the Week 1 ends on a Sunday the days will be presented in the Temp Desks as Monday to Sunday. To present the days in a different order make the Week 1 end on what is your last day of a week. (Not available with Safe Back Office)\\ | ||
- | 2.20.6 Added columns to show the start and end dates for week 1 with colour indication if overlapping or with a gap. | + | 2.20.6 Added columns to show the start and end dates for week 1 with colour indication if overlapping or with a gap.\\ |
- | 2.20.8 Repopulate Table button will rebuild existing data in a table using a more efficient procedure. | + | 2.20.8 Repopulate Table button will populate the added year's dates in a table - must be run after adding |
- | {{: | + | {{: |
==== Temp Desks ==== | ==== Temp Desks ==== | ||
Line 73: | Line 73: | ||
* Enter the Pay Rates and Charge Rates in the Pay Bands appropriate for the scheme. Extra Bands can always be added. | * Enter the Pay Rates and Charge Rates in the Pay Bands appropriate for the scheme. Extra Bands can always be added. | ||
- | From version 2.18.8 the [[Rate Scheme Calculator]] can be used to help with maintaining rate schemes. | + | From version 2.18.8 the [[Rate Scheme Calculator]] can be used to help with maintaining rate schemes. \\ |
+ | |||
+ | From version 2.21.8 it is possible to create a global default rate scheme for use with e-timesheets that will be applied to all vacancies that don't already have a client default scheme. | ||
+ | If needed you can create multiple ‘Global Default’ schemes for different departments/ | ||
Line 106: | Line 109: | ||
* Shift Type - Is for use with Rate Scripts | * Shift Type - Is for use with Rate Scripts | ||
* Analysis Code - Is for use with exceptional reporting requirements | * Analysis Code - Is for use with exceptional reporting requirements | ||
- | Guidance from LSM Logic is required if complex shift timesheeting is to be used. | + | Guidance from IQX is required if complex shift timesheeting is to be used. |
\\ \\ | \\ \\ | ||
Line 118: | Line 121: | ||
Cancellation Reasons control who is to be notified of a cancellation, | Cancellation Reasons control who is to be notified of a cancellation, | ||
\\ | \\ | ||
- | {{: | + | {{: |
+ | A reason can only be deleted if it has never been used so from 2.21.8+ to ' | ||
+ | From 2.22.9+ a department can also be assigned to a cancel reason. | ||
==== Shift Order Reasons==== | ==== Shift Order Reasons==== | ||
Line 134: | Line 139: | ||
==== Unavailability Reasons ==== | ==== Unavailability Reasons ==== | ||
- | Candidates can have periods of time blocked out of their diary as unavailable. | + | Candidates can have periods of time blocked out of their diary as unavailable. |
+ | A reason can only be deleted if it has never been used so from 2.21.8+ to ' | ||
==== Compliance Domains ==== | ==== Compliance Domains ==== | ||